Tuesday, December 8, 2009

Skin and frame work

Dad and me got some more work done on R3 today. :) This is starting to turn into a father and daughter project.

The picture above shows the drawing we're using to show us where the panels and everything goes. You can also see some of the guide lines dad drew on the skins.
I got quite few panels drawed and cut out of some .40 styrene today too including the arms.
Below shows how we figured out how to get the vent to fit in a Dave E. frame.

As you can see the standard Dave E. frame is not designed for the CW droid. Here we will have to modify the frame for the pocketvent.

2 pieces need to be removed from the frame for the pocket vent to fit.

We used a dremel to trim the frame verticals back 1-1/4 inch to make room for pocket vent. And trimmed the frame ring back 3/4 inch to make more room for the vent to fit properly.

Cut a new vertical piece and glue here for added support. This leaves room for pocket vent.

We should be finishing up the vent tommorrow.

1 comment:

The life of thomas said...

Your project is looking cooler and cooler!!!

/Thomas